Liner Pricing
« on: Apr 16, 2015, 01:16:19 PM »
I would like to see added funcionality for pricing the labor of insulation and liner.  The minutes per square foot to line a 8x8 elbow is way different than the minutes per square foot to line a 48x48x5' piece of duct.

I would like to see the option to distinguish between straight duct and fittings in the insulation specifications.  That way multiple liners and insulations could be setup with different labor rates.

Better yet, would be to give the option to point insulation and liner to a labor table which could then be given break points.  I attached a PDF showing how I would like to see a table setup.

Other estimating systems such as Quickpen Accubid Sheet Metal and Quote Express have that functionality, it would be great to see it added to ESTmep as well.

Offline Tstright

  • Premier Member
  • *****
  • Posts: 998
  • Country: us
  • Gender: Male
    • United Association of Journeymen and Apprentices of the Plumbing and Pipe Fitting Industry of the United States and Canada
Re: Liner Pricing
« Reply #1 on: Apr 16, 2015, 02:18:01 PM »
"Only the Skilled Survive"
Dell T7610 Xeon 3.4Ghz, 32GB Ram, Quadro K5000 4GB
Autodesk AEC Collection 2018

Offline VirtualPilot

  • Premier Member
  • *****
  • Posts: 6444
  • Country: us
  • Gender: Male
Re: Liner Pricing
« Reply #2 on: Apr 16, 2015, 02:55:49 PM »
I have been asking for that ability for years, Insulation Spec NEEDS to be able to differentiate between STRAIGHTS and FITTINGS... specially for us where Spiral duct gets PERFORATED Inner material and Fittings get Solid Material... with that capability I would not have to manually change Fittings ID at the end of every freaking Double Wall job...  >:(
Santos Cedeno
CAD/BIM Mgr - DIXIE Metal Products

Offline dcapestanyTopic starter

  • Active Member
  • **
  • Posts: 20
  • Country: us
  • Gender: Male
    • Zinger Sheet Metal
Re: Liner Pricing
« Reply #3 on: Apr 17, 2015, 06:00:40 PM »
I agree.  We run into the same issue with double wall so we have two specs, one solid, one perf and we have to do a change spec before it goes out to the plasma table.  A little added functionality would save a lot of headaches. 

Offline Kuhns

  • Full Member
  • ***
  • Posts: 90
  • Country: us
  • Gender: Male
    • MacDonald-Miller
Re: Liner Pricing
« Reply #4 on: Apr 30, 2018, 09:54:00 PM »
We set up different sound liners in the "Insulation Material"

SL
SL - Decoiled Straight
SL - Machine Cut Straight
SL - Fittings

All the SL have the same Cost $/(sq Ft), but each has a different F time (min)/(Sq Ft)

After a job is completely taken off (using the "generic" SL, we run a script that applies the correct SL to an item...
This will then apply the correct SL to the item...

Works like a charm...
Gene L. Kuhns, Jr. - LEED AP
Sr. Estimator, MacDonald-Miller
Seattle, WA
Fabrication 2016 ESTmep

Offline cnash

  • Premier Member
  • *****
  • Posts: 924
  • Country: us
  • Gender: Male
    • William R. Nash Companies
Re: Liner Pricing
« Reply #5 on: Jun 05, 2018, 06:17:26 PM »
We set up different sound liners in the "Insulation Material"

SL
SL - Decoiled Straight
SL - Machine Cut Straight
SL - Fittings

All the SL have the same Cost $/(sq Ft), but each has a different F time (min)/(Sq Ft)

After a job is completely taken off (using the "generic" SL, we run a script that applies the correct SL to an item...
This will then apply the correct SL to the item...

Works like a charm...

Do you do anything for piping insulation?
Christopher Nash
Pre-Construction Coordinator
All things Database Management & Autodesk Product Support
William R. Nash Companies

Offline Dave M

  • Full Member
  • ***
  • Posts: 73
  • Country: au
  • Gender: Male
Re: Liner Pricing
« Reply #6 on: Jun 14, 2018, 02:06:29 PM »
Unless I have missed the point of this thread, why aren't you using value sets & assigning tables for the additional labour times for each value set?
Each value set could then have it's own custom rule which references the insulation thickness & even if its double wall.