When populating a Design Line (DL) using 3D fill for waste piping runs longer than supplied pipe lengths, the program places the cut piece before full sticks.
Example: On a straight 14 ft section of NHCI piping, the first pipe placed by the program (starting from downstream source) is 3'-11 7/8". It then places the 10'-0" piece. Actual field installation would be placing full sticks first and then the final short piece. The last (short) piece could then be listed as field cut - this will accommodate site conditions and/or component tolerances.
Is there a way to change the DL pipe order to reflect the true installation order in the field?