Hi,
Has anyone discovered that the Fabrication hours given in the Estimating summary are incorrect?
I have a job 5 pieces of duct for testing. The total comes out to 2.36 hours to make. The estimating summary reports 2.21 Hours.
If i use the reports, and add the fabrication fields by hours. It reports the same as 2.21. If i use a calculated field and change my fabrication reports to minutes / 60 I get 2.36 which is correct.
Anyone know why these would be different?
Edit* this is ESTMEP 2021.
Item fabrication time line by line, if i calculate these manually these equal the calculated formula for Fabrication Time Mins/60.
If i set the Fabrication time to hours, I get a different result equal to what is stated in the Quick Summary.