Author Topic: ITM Hangers and Rod Lengths  (Read 322 times)

0 Members and 1 Guest are viewing this topic.

Offline chillstrides12Topic starter

  • Active Member
  • **
  • Posts: 6
  • Country: us
  • Gender: Male
ITM Hangers and Rod Lengths
« on: Oct 14, 2024, 22:04:10 PM »
this may be more of a general revit question, but how do i get a hanger schedule to include the rod length?

New to spooling in Revit and looking to get both a pipe and hanger parts list for prefab. Figured out the pipe part, now trying to get the hangers down.

Offline davidratx

  • Premier Member
  • *****
  • Posts: 1413
  • Country: us
  • Gender: Male
Re: ITM Hangers and Rod Lengths
« Reply #1 on: Oct 15, 2024, 00:50:28 AM »
You'll need an addin for that. I think most all the ones on the market have some kind of tool that will make it possible. Do you subscribe to anything in specific?
David Ronson
TDIndustries Director of Construction Technologies
Windows 10 - Revit - AutoCAD - CADmep - ESTmep - CAMduct - GTP Stratus

Offline rjdonahue

  • Active Member
  • **
  • Posts: 14
  • Country: us
  • Gender: Male
Re: ITM Hangers and Rod Lengths
« Reply #2 on: Nov 11, 2024, 15:03:05 PM »
I assume you have eVolve, since you're posting this in the eVolve Mechanical Users forum, so the parameter you are looking for is "eM_Length A".

If you're looking for both rods on a trapeze, its "eM_Length A" and "eM_Length B".

If you don't have evolve, then like David said, you'll need some add-in that maps the parameters from the database or you'll need to use dynamo.
Steamfitters Local 449