All the good engineers are in Dubai. This is what's left!
Plumbers (when they do participate) typically lag behind and pretend to go through the motions, only to turn their field guys loose with contract plans and no actual "coordinated" shop drawings to work from.
Electricians claim "we don't have to model anything under 1" (when they model anything at all), which they interpret to include five foot racks of hundreds of 3/4" conduits. Plumbers (when they do participate) typically lag behind and pretend to go through the motions, only to turn their field guys loose with contract plans and no actual "coordinated" shop drawings to work from.
Working on a project right now with over three years invested into design and 3D coordination, only to be stomped on by every other trade throughout the entire project by a race to "get in first" and a GC with no backbone to enforce the 3D model, with the final result being "the ductwork can move".
Not that I'm bitter or anything...