XtraCAD.com
Fabrication in Revit® => Fabrication Parts in Revit® => Topic started by: ChrisH on Oct 01, 2018, 19:12:17 PM
-
I'm having a weird issue I can't quite figure out. Ideally we would be drawing in the correct service but I guess we don't live in a ideal world.
So..... Using Revit 18.3 with MEP fabrication parts. A duct run is drawing with a 4" service. In this example its just a couple straight joints with a volume damper in it. I highlight the run and use the change service command. I select a 2" service and click finish. The run is then switched to 2" but.... my volume damper turns into a access door. Its very strange. The similar task works correctly in CADmep. Access doors have different button codes then volume dampers. I have no idea why this is happening. I can exclude the access door from fill and change service, then the damper just stays 4" and is no longer connected to the duct.
Any ideas?
-
This is a bit different but on the same topic of access doors. Is there a magic button or something I'm missing to get access doors to place on transitions or sq to rd?
-
I just eye snap them on! There is not a setting and will not cut hole either.