With a different program, when one is using trapeze hangers, one could set the hanger to "rack" and one would get the rollers or U-bolts , nuts and washers needed to connect the pipe to the trapeze.
I am not seeing this option for EST-Mech. How are you accomplishing this? Did you set up an assembly for the rollers/U-bolts and Utilizing Variable Dimensions, pick the size & quantity you need? Or, did you do something else?
|
|
| 10-November-2009 15:51:44 |
|
Kuhns
Sr. Piping Estimator
From: Seattle, WA
Registered: 10-October-2008
Posts: 4
|
|
|
| 11-November-2009 16:13:26 |
|
wicked
Senior Member
 Registered: 06-February-2007
Posts: 81
|
|
for duct i set the angle or channel on the lowest duct and use that one to order the rods off. the next duct up in elevation i set an angle or channel then set the rods to zero so they dont get ordered. is a pain in the but
_______________________________________ cad duct ver 2.37.176, MEP 2009, Vista 64 tin knockers are like a box of chocolate "half the box is nuts"
|
|